-
- CE05 - SEISMIC VULNERABILITY ASSESSMENT OF EXISTING BUILDINGS IN (GIS) ENVIRONMENT: DUHOK -“SHELE” SUB-DISTRICT AS A CASE STUDY
- CE09 - THE IMPACT OF CAR PARKING REGULATION ON THE PARKING AREA CAPACITY
- CE03 - ORIGIN-DESTINATION STUDY FOR UOD CAMPUS AREA
- CE07 - IDENTIFYING SOURCES AND EFFECTS OF GROUNDWATER NITRATE CONTAMINATION IN DIFFERENT AREAS IN DUHOK GOVERNORATE
- CE04 - DESIGN OF A WIND FORCE RESISTING SYSTEM IN A MULTI-STORY BUILDING
- CE01 - WATER DISTRIBUTION SYSTEM FOR HEWRESKY VILLAGE IN SUMEAL DISTRICT-DUHOK
- CE11 - COMPARISON BETWEEN EURO CODE, BRITISH STANDARD, AND ACI CODE IN DESIGNING HIGH-RISE BUILDING
- CE02 - CONSTRUCTIONAL AND STRUCTURAL DESIGN OF A MULTISTORY BUILDING
- CE08 - GEOTECHNICAL PROPERTIES OF CONTAMINATED CLAY SOILS (CASE STUDY FROM DUHOK GOVERNORATE
- CE06 - REINFORCED CONCRETE DESIGN PROJECT FOR FIVE STORY BUILDING
- CE10 - EFFECT OF USING SHREDDED WASTE PLASTIC OF THE BEHAVIOR OF NORMAL WEIGHT CONCRETE
-
- WRE07 - DESIGN OF MICRO-HYDRO POWER PLAN IN GALI ZANTA RIVER
- WRE10 - EVALUATION OF THE STABILITY OF THE DUHOK DAM SLOPES UNDER STATIC AND DYNAMIC LOADING
- WRE11 - DESIGN UNDERGROUND SYSTEM (STORM AND WASTE) FOR VILLAGE IN THE MOSUL DAM
- WRE04 - EVALUATION OF THE DESIGN OF AN OPEN CHANNEL IN MALTA PROJECT CODE 43
- WRE05 - DESIGN OF WATER SUPPLY FOR UNIVERSITY OF DUHOK CAMPUS BY WATER CAD V8I SOFTWARE
- WRE03 - DESIGN OF REINFORCED CONCRETE CULVERT IN DUHOK UNIVERSITY CAMPUS ACCORDING TO HYDRAULIC AND STRUCTURAL CONSIDERATIONS
- WRE09 - DESIGN OF SANITARY SEWER SYSTEM FOR ENTIRE ASHTI DISTRICT IN DUHOK CITY
- WRE06 - PERFORMANCE OF SIERPINSKI CARPET DISTRIBUTION OF SCREEN HOLES ON THE ENERGY DISSIPATION
- WRE08 - FLOW MEASUREMENT USING OVERSHOT GATE AND ANSYS SIMULATION OF THE FLOW SITUATION
- WRE02 - IRRIGATION SYSTEM ASSESSMENT
- WRE01 - FLOW CHARACTERISTICS OF DERALOK RIVER BASIN IN DUHOK GOVERNORATE
- WRE07 - DESIGN OF MICRO-HYDRO POWER PLAN IN GALI ZANTA RIVER
-
- AR04 - DESIGN OF THE HEALTH COMPLEX IN NEW DUHOK
- AR02 - DESIGN OF THE INDUSTRIAL COMPLEX IN NEW DUHOK
- AR03 - DESIGN OF THE EDUCATIONAL COMPLEX IN NEW DUHOK
- AR01 - DESIGN OF THE RECREATIONAL COMPLEX IN NEW DUHOK
- AR05 - DESIGN OF THE RESIDENTIAL COMPLEX IN NEW DUHOK
- AR06 - DESIGN OF THE RELIGIOUS COMPLEX IN NEW DUHOK
- AR04 - DESIGN OF THE HEALTH COMPLEX IN NEW DUHOK
-
- ECE02 - AUTOMATIC BABY CRADLE WITH SLEEPING AID SYSTEM
- ECE11 - PATTERN-RECONFIGURABLE ANTENNA FOR 5.5-GHZ WIMAX APPLICATIONS
- ECE01 - ADAPTED TV REMOTE CONTROL USING EOG
- ECE06 - SMART CANE
- ECE17 - VOICE REMOTE CONTROL
- ECE04 - WIRELESS TANK FILLING PUMP CONTROLLER
- ECE13 - DESIGN OF A MICROCONTROLLER BASED QUADCOPTER
- ECE19 - EFFICIENCY CALCULATION OF SINGLE PATH FORCED FLOW SOLAR COLLECTOR IN REAL-TIME BY USING PROGRAMMABLE DATA LOGGER
- ECE03 - ACCESS SECURITY SYSTEM
- ECE05 - AUTOMATIC WATER TANK FILLING SYSTEM
- ECE14 - CONTROLLING SET OF DEVICES OVER IOT
- ECE16 - DESIGN OF DIGITAL ELECTRONIC PIANO
- ECE23 - COLOR DETECTOR
- ECE10 - DESIGN AND IMPLEMENTATION OF A LOW-COST CLASSROOM RESPONSE SYSTEM
- ECE20 - DESIGN OF DIGITAL VOTING SYSTEM
- ECE12 - SPEED CONTROL OF A DC MOTOR USING VOICE COMMANDS
- ECE15 - HAND MOVEMENTS ORDER DEVICE
- ECE22 - RAIN ALARM DETECTOR
- ECE24 - SOFT CONTROLLER
- ECE09 - MICROCONTROLLER BASED SINGLE PHASE DIGITAL PREPAID ENERGY METER FOR IMPROVED METERING AND BILLING SYSTEM
- ECE21 - CONTROLLING THE SPEED OF DC MOTOR USING PC
- ECE07 - WIRELESS WEATHER MEASURING STATION SYSTEM
- ECE08 - IMAGE RECOGNITION
- ECE02 - AUTOMATIC BABY CRADLE WITH SLEEPING AID SYSTEM
یوم التصمیم الهندسي الرابع
The design projects were evaluated by a special committee formed on the departments level including members from the College of Engineering and guest members from the industry. The evaluation criteria are related to the content, presentation and poster quality.
Click on the tabs below to view the projects ranking in individual departments.